Fabrika-Gribow - Mushroom Farm
Project Management
Fabrika-Gribow
Investor
We built this mushroom farm on site of the existing foundations that were laid by previous investor 5 years earlier. The facility consists of 7 growing rooms, at 460 m2 each, assuming to be grown on 4th phase of compost, with the possibility of switching to the 3rd phase with load of 530 m2 into one growing room. Concept of the site and the supplied equipment allows the facility to be expanded by another 6 Growing rooms with similar parameters. The first stage of the mushroom farm was started and completed in 2019.
0
m2
building
surface area
surface area
0
m2
mushroom
growing surface
growing surface
0
year of
completion
completion
Other Projects
completed as a General Contractor
Are you looking for a reliable construction partner?